Drone survey
Drone Surveying
We use drone photogrammetry to map large sites and construction works. Georeferenced imagery produces an orthomosaic and a digital surface model for comparing survey dates.
What we deliver
Scope of work
Define the survey footprint and ground sampling distance
Plan flight lines and image overlap
Place ground control and checkpoints for the specified accuracy
Process imagery and check results against independent points
Simple process
Survey method
Site assessment
Reviewing the site's area, obstacles, and the purpose of the mission.
Preparation
Lay out flight lines for image overlap and full site coverage.
Aerial capture
Capture the survey lines and record acquisition times for the survey epoch.
Processing
Align the images, build the orthomosaic and check residuals at independent checkpoints.
Deliverables
FAQ
Frequently asked questions
Is drone surveying suitable for every site?+
Suitability is assessed based on the site's area, the nature of its obstacles, operational constraints, and the type of deliverable required.
How do control points differ from checkpoints?+
Control points tie the model to project coordinates. Checkpoints are withheld from adjustment and their surveyed coordinates tested against the finished model.
Can drone surveying be used to monitor project progress?+
Yes, periodic visits can be planned to document site conditions on different dates when this is included within the scope of work.
