Sewer network design
Sewer Network Design
We design gravity sewer alignments using surveyed levels and the connection point. Longitudinal sections show pipe inverts, gradients and manhole locations.
What we deliver
Scope of work
Review ground levels and the connection point
Lay out pipes and manholes
Set pipe invert levels and gradients
Check manhole depths and known conflicts
Simple process
Survey method
Collect Inputs
Receive the plan, connection points, and survey data.
Analyze Routes
Review the terrain, obstacles, and available gradients.
Prepare the Design
Draw a profile for each reach and show invert levels and gradients between manholes.
Coordinate Deliverables
Prepare the drawings and schedules for review.
Deliverables
FAQ
Frequently asked questions
Is a land survey required before designing the network?+
Accurate level data is essential. The office can carry out the survey if recent and suitable data is not available.
Which levels appear on a sewer profile?+
The profile shows ground level, inlet and outlet inverts, and manhole depth. Each reach is labelled with its length and gradient.
How is the connection point selected?+
Selection depends on the project data, the available service connection point, and the technical information provided by the client or relevant authority.