Surveying and engineering support across Saudi Arabia

Sewer network design

Sewer Network Design

We design gravity sewer alignments using surveyed levels and the connection point. Longitudinal sections show pipe inverts, gradients and manhole locations.

What we deliver

Scope of work

01

Review ground levels and the connection point

02

Lay out pipes and manholes

03

Set pipe invert levels and gradients

04

Check manhole depths and known conflicts

Simple process

Survey method

01

Collect Inputs

Receive the plan, connection points, and survey data.

02

Analyze Routes

Review the terrain, obstacles, and available gradients.

03

Prepare the Design

Draw a profile for each reach and show invert levels and gradients between manholes.

04

Coordinate Deliverables

Prepare the drawings and schedules for review.

Deliverables

01Sewer layout plan
02Longitudinal pipe profiles
03Manhole and connection level schedule

FAQ

Frequently asked questions

Is a land survey required before designing the network?+

Accurate level data is essential. The office can carry out the survey if recent and suitable data is not available.

Which levels appear on a sewer profile?+

The profile shows ground level, inlet and outlet inverts, and manhole depth. Each reach is labelled with its length and gradient.

How is the connection point selected?+

Selection depends on the project data, the available service connection point, and the technical information provided by the client or relevant authority.

Start your request

Quotation for Sewer Network Design

Send the site location and available drawings for a quotation.