Topographic survey
Topographic Survey
We survey ground levels, breaks in slope, roads and structures. The topographic plan and terrain model provide the existing levels for grading and site design.
What we deliver
Scope of work
Establish the vertical reference and survey limits
Pick up road edges, slope crests and toes
Build the terrain model from survey points and breaklines
Generate contours at the specified vertical interval
Simple process
Survey method
Define the survey limits
Confirming the site scope and the required point density.
Survey elevations
Collecting surface points and relevant features in the field.
Build the surface model
Build a triangulated terrain surface from spot levels and breaklines.
Prepare the plan
Issue the contour plan with the vertical datum and contour interval.
Deliverables
FAQ
Frequently asked questions
What is the difference between a topographic survey and a detailed survey?+
A topographic survey focuses on the surface shape, elevations, and slopes, while a detailed survey may focus on all existing elements and features according to its purpose.
How is survey point density chosen?+
Observations are closer at changes of grade, edges and channels. On flatter ground, spacing follows the plan scale and terrain model tolerance.
Does the survey include contour lines?+
Contour lines can be prepared as part of the deliverables after agreeing on the appropriate interval and the purpose of the study.
